Gold Member Since 2006
Audited Supplier
CNC Electric Group Co., Ltd.

Watt-Hour Meter, Energy Meter, Power Meter manufacturer / supplier in China, offering DTSD726, DSSD726 Three-phase Electronic Multi-function Watt-hour Meter, 145W 12A Single Output LED 12V Constant Voltage DC Power Supply, Cooling Aluminum Shell DC Regulated 100W 48V Switch Power Supply DC and so on.

(/ )

Supplier Homepage Product Energy Meter DTSD726, DSSD726 Three-phase Electronic Multi-function Watt-hour Meter

DTSD726, DSSD726 Three-phase Electronic Multi-function Watt-hour Meter

FOB Price: US $5.789 / Piece
Min. Order: 20 Pieces
Min. Order FOB Price
20 Pieces US $5.789/ Piece
Get Latest Price
Production Capacity: 5000PCS
Transport Package: Standard Export Package
Payment Terms: L/C, T/T, D/P, Paypal

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: DTSD726, DSSD726
  • Installation: Direct Connected
  • Electric Equipment: Three-phase Four-wire
  • Power Meter Connection: Terminal
  • Type: Energy Meter
  • Customized: Customized
  • Place of Origin: Zhejiang, China (Mainland)
  • Rated Voltage(V): 3X220/380
  • Expansible: RS485
  • Way of Display: Register,LCD Meter
  • Weight(Kg): 0.5 Meter
  • Origin: Yueqing, Zhejiang, China
  • Display: Digital
  • Usage: Multi-Functional Energy Meter
  • Theory: Electronic Meter
  • Measured Signal: Pulse Peak
  • Certification: ISO
  • Brand Name: CNC
  • Rated Current(a): 3X1.5(6),3X5(20),3X10(40),3X15(60),3X20(80)
  • Rated Frequency(Hz): 50 or 60
  • Type of Standard: GB/T17215.321-2008 GB/T18460-2001
  • Delivery Time: 7days
  • Trademark: CNC OR OEM
  • HS Code: 90283010
Product Description
DTSD726, DSSD726 Three-phase Electronic Multi-function Meter

Key words: Watt-Hour Meter, meter, power meter, multi meter, electronic meter, kwh meter, Multi-Function Watt-Hour Meter, multi function meter, single phase meter, three phase meter.

1. General

The DTSD726, DSSD726 type three-phase electronic multi-function watt-hour meter is a new type of multi-function meter. It accords with the correlative standard, rules of the nation. It has the function as high-accuracy, well stability, advanced technology and easy operation.

2. Function and features

2.1 Forward direction, reverse direction and 4 quadrants are reactive power and max demand, the time of max demand;
2.2 Spit phase measuring;
2.3 4 rates, 4 time zones, 6 time period, 10 day time, 12 pubic holidays;
2.4 Measuring power, demand, power factor at current time;
2.5 The data can be congeal automatically and recording data within 12 months;
2.6 The active forward & reverse direction and the reactive 4 quadrants output via pulse. The pulse width can be setup by controller or Rs485;

IEC61036 and IEC61038 standards.

3. Specifications:

1) Voltage range: Single phase 220V/ three phases 380V
A) Specified operating range: 0.85Un~1.1Un
B) Limit range of operation: 0.75Un~1.15Un
2) Rated frequency: 50Hz
3) Starting current: 0.004Ib
4) Power consumption in voltage circuit: ≤ 2W or 2.5VA
5) Power consumption in current circuit: ≤ 2.5VA
6) Dimensions (L x W x H): 164.5 x 112 x 71mm
7) Net weight: 0.7kg
8) Clock accuracy: Daily timing error less than 0.5s (reference temperature)
9) Battery capacity: ≥ 1, 000mAh
10) Data preservation: ≥ 10 years
11) Temperature range:
12) Specified operating range: -25 ~ +55 C
13) Limit range of operation: -40 ~ +70 C

Rated current (A)

3X1.5(6), 3X5(20), 3X10(40), 3X15(60), 3X20(80), 3X30(100)

Rated voltage (V)

Three-phase three-wire  3× 100V or 3× 380V    Three-phase four-wire  3× 220/380V or 3× 57.7/100V

Rated frequency (Hz)

50 or 60

Accuracy class

Active: 0.5    Reactive: 1.0 or Active: 1.0, Reatctive: 2.0

Clock error

≤ 0.5sec/per day(reference temperature); ≤ 1.0ssec/ per day(the backup lithium battery working time)

Battery

Imported lithium battery: Voltage: 3.0V or 3.6V: Capacitance≥ 1000mAh; 1200bps~19200bps. It has the program both inside

and outside; Update the date per0.01 degree; Two sets of battery keep the clock and relative date: setup the alarm data of the

battery. Loss and press blanking timing and electric consumption rate switches over time in the minimum interval for one minute.
Send your message to this supplier
Avatar
Mr. Victor Ye
G. Manager
*From:
To: Mr. Victor Ye
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now